Agricultural Ground Mount — Pelican Rapids
- City: Pelican Rapids, MN (Greater MN County)
- Installed: June 2024
- System: 120 panels / 58.8 kW DC
- Equipment: five arrays of 24 · pile-driven
- Utility: Red River Valley Electric
- Mounting: Pile Driven Ground Mount
The Project
A working farm in Red River Valley co-op territory, powered by five separate ground arrays — 120 panels, 58.8 kW — spread across open field. For farms, the math stacks three deep: 30% federal ITC + accelerated depreciation + USDA REAP grant (up to half the project cost for eligible rural businesses). Energy is one of a farm’s biggest controllable costs; this one took control.
Own a building, farm, or facility? Let’s model your roof or land — including the 30% federal ITC, accelerated depreciation, and (for working farms) USDA REAP. Free feasibility review. 📞 (651) 565-1140 · Request a free consultation
