The Section 48E Commercial Solar Tax Credit and the 2027 Deadline

The 30% federal credit for business solar still exists, but new projects now race a Dec. 31, 2027 placed-in-service deadline. Here's what counts and what to do now.

★★★★★ 86 Google reviews500+ customers30-yr warrantyLicensed EA761814 · BC810322Family-Owned & OperatedVeteran-OwnedBBB A+ Accredited
Business owner reviewing commercial solar ROI and tax credit financials on a laptop

Reviewed by John Ihle, MN Master Electrician (AM005101) · NABCEP-credentialed · iSolar, Saint Paul Park, MN · Last reviewed October 2026

The short answer: Under the One Big Beautiful Bill Act, commercial solar projects that began construction by July 4, 2026 keep a longer timeline, while projects starting after that date must be placed in service by December 31, 2027 to claim the Section 48E credit. It's generally 30% for systems under 1 MW AC; larger systems must meet prevailing wage and apprenticeship rules.

The rule in one paragraph

The One Big Beautiful Bill Act (P.L. 119-21, signed July 4, 2025) put an end date on the federal clean electricity investment credit for solar under Section 48E. Solar projects that began construction on or before July 4, 2026 keep the longer, pre-existing timeline. Projects that begin construction after July 4, 2026 must be placed in service by Dec. 31, 2027, or they get no credit. As of this fall, July 4 has passed, so any business starting a new solar project now is working against the 2027 placed-in-service deadline.

This guide explains both paths, the construction tests, the foreign-entity rules, the labor rules for the full 30%, and what to do this quarter. It's general information, not tax advice. Confirm your situation with your CPA or tax counsel.

Two paths: began construction vs. placed in service

Path A: began construction by July 4, 2026Path B: begins construction after July 4, 2026
DeadlineGenerally a 4-year continuity safe harbor from the year construction beganMust be placed in service by Dec. 31, 2027
What you must proveBeginning of construction, then continuous progressThe system is complete and ready for its intended use by year-end 2027
Foreign-entity (FEOC) material rulesApply if construction began in 2026Apply
Who this fitsProjects already started or safe-harboredMost new small and mid-size commercial projects today

"Placed in service" generally means the system is complete and ready and available to do its job. For a grid-tied solar project, that usually ties closely to utility approval to operate. Ask your tax advisor how to document it, and build in schedule margin, because utility review can take months on larger systems.

How "beginning of construction" works, and why the 5% rule is in flux

For Path A projects, the date construction began controls everything. The IRS has long recognized two ways to establish it:

  • Physical work test. Starting physical work of a significant nature, either on site (for example, installing foundations or racking) or off site under a binding written contract (for example, a manufacturer building custom components for your project, not pulling stock from inventory). After that, work must continue as a continuous program of construction.
  • 5% safe harbor. Paying or incurring at least 5% of the project's total cost before the deadline.

Here's where it gets complicated:

  1. In August 2025, the IRS issued Notice 2025-42, which eliminated the 5% safe harbor for most wind and solar projects (keeping it only for small solar under 1.5 MW AC) and leaned on the physical work test.
  2. On June 6, 2026, a federal district court in Washington, D.C. vacated Notice 2025-42 in Oregon Environmental Council v. IRS, finding it arbitrary and capricious. Law firm analyses note the ruling applies to all taxpayers and restores the 5% safe harbor unless and until the IRS issues revised guidance.
  3. As of early September 2026, the government had not filed a notice of appeal, according to a Clifford Chance briefing. The IRS can still issue new guidance.

Bottom line: beginning-of-construction guidance is still evolving. If you claim a July 4, 2026 start, document it under the physical work test where you can, keep 5% safe harbor records as a backup, and have your tax advisor review both. Don't rely on a single theory.

The FEOC / material assistance rules, in plain English

For projects beginning construction after 2025, the credit is off the table if the project receives too much "material assistance" from a prohibited foreign entity (often called FEOC rules). The test compares the cost of components that are not from prohibited foreign entities to the total cost of covered components. That's the material assistance cost ratio.

  • Treasury's interim guidance, Notice 2026-15 (February 2026), sets the threshold at 40% for qualified facilities beginning construction in 2026, rising 5 points per year through 2029.
  • The notice lets taxpayers use existing safe harbor tables to identify components and assign cost percentages, and to rely on supplier certifications.
  • Separate rules bar the credit for taxpayers that are themselves prohibited foreign entities.

What that means for you: equipment choice now affects tax eligibility. Ask your installer which panels, inverters and racking they plan to use, and whether the manufacturers will provide the certifications your tax advisor needs.

Prevailing wage and apprenticeship: the 1 MW line

The 48E credit starts at a 6% base and rises to 30% when the project meets prevailing wage and apprenticeship requirements. Projects with a maximum net output under 1 MW AC are exempt from those requirements and still get the full 30%.

For projects of 1 MW AC or more, that means paying Davis-Bacon prevailing wages to laborers and mechanics during construction (and for repairs during the credit period), meeting registered apprenticeship labor-hour percentages, and keeping payroll records. Most small business, farm and church projects fall well under 1 MW AC.

Bonus adders

  • Energy community: +10 percentage points for sites in designated areas.
  • Domestic content: +10 percentage points if steel and iron are U.S.-made and enough of the manufactured product cost is domestic (50% for projects beginning construction in 2026).

Tax-exempt owners such as churches, schools and cities can use elective pay instead of a tax liability; see solar for Minnesota churches and nonprofits. For a full picture of incentives, see our commercial solar financing and incentives page.

Using the credit: tax appetite, transfers and depreciation

A credit only helps if you can use it. Three points to raise with your CPA:

  • Tax appetite. The credit offsets federal income tax. Passive-activity and at-risk rules can limit how owners of pass-through businesses use it.
  • Transferability. Businesses that can't use the credit can generally sell it for cash to an unrelated buyer, typically at a discount.
  • Depreciation. Claiming the credit reduces your depreciable basis by half the credit. Bonus depreciation was restored to 100% for qualified property acquired after Jan. 19, 2025, while the IRS says solar lost its special 5-year MACRS class for projects beginning construction after 2024.

What businesses should do now

If your project hasn't begun construction, work backward from Dec. 31, 2027. A practical timeline:

WindowMilestone
Q4 2026Site assessment, 12 months of bills, roof and electrical review, CPA confirms you can use the credit
Q4 2026 – Q1 2027Design, priced proposal, signed contract, utility interconnection application
Q1 – Q2 2027Permits, equipment ordering with FEOC documentation, structural sign-off
Q2 – Q3 2027Installation and inspections
By Q3 – Q4 2027Utility approval to operate, commissioning, placed-in-service documentation, with a margin before Dec. 31

A checklist for this quarter:

  1. Call your CPA. Confirm tax appetite, depreciation plans, and whether transferability or elective pay applies.
  2. Get a site visit. Roof age, structure, service voltage and phase all affect schedule.
  3. File interconnection early. Utility review is often the longest lead item.
  4. Lock equipment with paperwork. Ask for FEOC certifications and domestic content data up front.
  5. Check the 1 MW AC line. Staying under it avoids prevailing wage and apprenticeship requirements.
  6. Write the deadline into the contract. Agree on schedule responsibilities in writing.

Want cost and payback context first? Read commercial solar cost in Minnesota for 2026 or run your building through our commercial solar ROI calculator.

Plan your 2027 project with us

The credit is still worth 30% or more for most Minnesota businesses, but the window is fixed. Our 2027 commercial solar planning page lays out how we schedule projects against the deadline. When you're ready, request a quote and we'll build a timeline that lands your system in service with room to spare.

Sources

Good questions

Frequently asked.

What is the deadline for the commercial solar tax credit?

Solar projects that begin construction after July 4, 2026 must be placed in service by December 31, 2027 to claim the Section 48E credit. Projects that began construction by July 4, 2026 generally keep a 4-year continuity window instead.

Is the 5% safe harbor still available for solar?

A federal court vacated IRS Notice 2025-42 on June 6, 2026, which restored the 5% safe harbor for wind and solar unless and until the IRS issues new guidance. As of early September 2026, no appeal had been filed. Guidance is still evolving, so confirm with a tax advisor and document physical work where possible.

Do small commercial solar projects need to pay prevailing wage for the 30% credit?

Projects with a maximum net output under 1 MW AC are exempt from the prevailing wage and apprenticeship requirements and can still get the full 30%. Projects of 1 MW AC or more must meet them or the credit drops to a 6% base.

What are the FEOC rules for solar tax credits?

For projects beginning construction after 2025, the credit is denied if too much of the covered component cost comes from prohibited foreign entities. Treasury's Notice 2026-15 sets a 40% material assistance cost ratio threshold for facilities beginning construction in 2026, rising each year.

Can nonprofits and churches use the 48E credit?

Yes. Tax-exempt organizations, schools and local governments can use elective pay to receive the credit value as a payment. The same construction and placed-in-service deadlines apply.

What does placed in service mean for a solar project?

Generally, the system is complete and ready and available for its intended use. For grid-tied solar that usually lines up with utility approval to operate, so leave schedule margin and ask your tax advisor how to document the date.